Coastal Restoration Trust of New Zealand

Coastal Dune Ecosystem Reference Database

Kaituna River rediversion and Ongatoro/Maketū Estuary enhancement project - Construction description and drawings Technical Report

Author
Everitt, S.
Year
2014
Publisher / Organisation
WaterLine Engineering Consultants
Pages
25
Summary
For Bay of Plenty Regional Council The Kaituna River Re-diversion and Ongatoro/Maketū Estuary Enhancement Project proposes to re-divert 20% of the water from the Kaituna River back into the Ongatoro/Maketū Estuary while keeping Te Tumu Cut open and create at least 20 hectares of new wetland. The preferred option (Figure 1) has been investigated in detail to assess its benefits and any actual and potential environmental effects. This report describes the various construction activities, their programming and risks and estimated costs. It also provides detail of the expected short-term environmental effects of the construction and outlines the Regional Council’s plans to avoid, remedy or mitigate these.